Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74017 REL 25: 2007-393-00 EXP SE-WA /NE OR WATERSHED HABITAT: PROTECT & RESTORE
Project Number:
Title:
PROTECT & RESTORE NE OR & SE WA WATERSHED HABITAT
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
74017 REL 25
Contract Title:
2007-393-00 EXP SE-WA /NE OR WATERSHED HABITAT: PROTECT & RESTORE
Contract Continuation:
Previous: Next:
75659: 2007-393-00 EXP SE-WA /NE-OR WATERSHED HABITAT: PROTECT & RESTORE
  • 74017 REL 45: 2007-393-00 EXP SE-WA /NE-OR WATERSHED HABITAT: PROTECT & RESTORE
Contract Status:
Closed
Contract Description:
Background: The purpose of this project is to develop, evaluate, prioritize and implement selected habitat restoration and enhancement projects in: (a) the Grande Ronde & Imnaha subbasins, and the Wallowa, Lostine & Pine watersheds in northeast Oregon; and (b) the Tucannon River, Alpowa Creek and Asotin Creek watersheds in southeast Washington. This will be accomplished through pursuing partnerships and collaborative activities with the ongoing programs associated with Grande Ronde Model Watershed and Snake River Salmon Recovery Board. Projects selected will be evaluated and prioritized on the basis of the existing conceptual restoration strategies or implementation frameworks (e.g., Atlas) developed in the Tucannon, Asotin County, and Grande Ronde watersheds.

Summary: This project provides coordination funding for NPT, to support implementation of watershed restoration projects on the ground through direct BPA program funding or outside (WA/OR grant) funding sources. Therefore, the emphasis in contract activities will be identifying and evaluating projects, coordinating with other entities to develop and manage implementation priorities, seeking funds to implement selected and prioritized projects, and the actual implementation of the projects.  Typically, the primary focus of restoration projects during the contract period will be efforts to reduce instream sedimentation, channel reconstruction to improve habitat complexity, riparian planting to reduce stream temperatures, and addressing passage barriers to increase available in-channel habitat area.  Other project types may occur during this period too, but the majority of the time will be spent implementing these projects and developing these types of projects for the next contract cycle.

Current Emphasis (FY18): In addition to the ongoing project activities described for this contract, the NPT will:
  --  advance the design, permitting, and pre-construction and/or construction activities for the Side-Channel Development and Floodplain Complexity habitat improvement project in the Wallowa River at the Homeland Site (Tamkaliks Side-Channel); and
  --  if funds are made available during the period, move toward a near-final design product for the Fish Passage and Habitat Improvement project at the Buford Creek Barrier Culvert (Hwy129), currently at a 60% design-stage.

Ongoing (WA): This NPT support contract facilitates the development of future projects and the refinement of work planning, consistent with the Tribes' sovereignty and self-governance; the NPT will assist with the identification, evaluation, selection and sequencing of projects for implementation pursuant to the prioritized restoration strategy of the Tucannon Habitat Programmatic [#2010-077-00], and partner with SRSRB participants to implement those projects. This contract continues the NPT role anticipated in this Habitat Project and in the Tucannon Programmatic Project to: (a) perform project evaluation and selection, implementation management, monitoring planning, data collection, outreach, and other tasks where tribal staff can provide expertise and capacity; and (b) be an implementer of the on-the-ground project construction activities for projects identified in the Programmatic work plan, and in the sub-regional Snake River Salmon Recovery Plan.
Account Type(s):
Expense
Contract Start Date:
04/01/2018
Contract End Date:
03/31/2019
Current Contract Value:
$235,603
Expenditures:
$235,603

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anthony Broncheau Nez Perce Tribe No Interested Party anthonyb@nezperce.org (208) 843-7317
Katie Frenyea Nez Perce Tribe Yes Contract Manager kathrynf@nezperce.org (541) 432-2506
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Travis Kessler Bonneville Power Administration Yes Env. Compliance Lead tdkessler@bpa.gov (503) 230-5468
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Montana Pagano Nez Perce Tribe Yes Technical Contact montanap@nezperce.org (541) 432-2507
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Interested Party rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Interested Party emmitt@nezperce.org (208) 621-3544
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project implementation management and contract administration 03/31/2019 03/21/2019
Documentation and assistance for environmental and cultural resource clearances B: 165. Environmental Compliance Clearance for watershed restoration & habitat enhancement projects 03/31/2019 03/18/2019
Atlas Process Development Guidance and Participation C: 191. Atlas Development Process (Wallowa-Lostine): Partcipation and Guidance 03/31/2019 03/07/2019
Regional Coordination in northeast Oregon and southeast Washington D: 189. Coordination with Partners 03/31/2019 03/18/2019
Identify, evaluate and select projects in the Imnaha and Grande Ronde subbasins and in SE WA E: 114. Develop, Evaluate & Select Habitat Projects 03/31/2019 03/19/2019
Develop projects, produce project-specific designs, and plan implementation F: 175. Design Specifications & Engineering: Salmonid Habitat Improvement Project Planning and Development 03/31/2019 02/28/2019
Produce and review design report, construction site plan, and/or cost-estimate G: 175. Buford Creek (Design Specifications & Engineering): Replace Culvert and Improve Habitat Complexity 03/31/2019 02/14/2019
Review and adjustments to design specifications and engineering; produce revised construction schedule and site plan H: 175. Tamkaliks Side Channel: Complete Design Specifications and Engineering Review 03/31/2019 03/31/2019
Submit (Annual) Progress Report for 2018 J: 132. Progress Report (calendar-year): 2018 (01/01/2018 - 12/31/2018) 03/31/2019 03/27/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project implementation management and contract administration 04/01/2018
B 165 Environmental Compliance Clearance for watershed restoration & habitat enhancement projects 04/01/2018
C 191 Atlas Development Process (Wallowa-Lostine): Partcipation and Guidance 04/01/2018
D 189 Coordination with Partners 04/01/2018
E 114 Develop, Evaluate & Select Habitat Projects 04/01/2018
F 175 Design Specifications & Engineering: Salmonid Habitat Improvement Project Planning and Development 12/21/2017
G 175 Buford Creek (Design Specifications & Engineering): Replace Culvert and Improve Habitat Complexity 12/21/2017
H 175 Tamkaliks Side Channel: Complete Design Specifications and Engineering Review 12/21/2017
I 185 Periodic Status Reports for BPA 04/01/2018
J 132 Progress Report (calendar-year): 2018 (01/01/2018 - 12/31/2018) 04/01/2018